Specified perils in construction contracts
Construction works involve large amounts of money and are at high risk of damage. As a consequence construction contracts will generally include an obligation to insure:
- The works.
- On-site materials or goods.
- Off-site materials or goods.
- Existing structures and their contents.
This insurance may cover all risks, or may be restricted to certain ‘specified perils.’
Specified perils tend to be significant events that would cause very significant damage, such as fire, explosions, earthquakes, flooding and so on. All-risks insurance will tend to cover a broader range of risks, albeit it may not cover every possible risk.
Policies may be taken out by the contractor or by the client depending on the form of contract and the options selected, and may be for all risks, specified perils, or a combination for different parts of the cover. For example existing structures might be insured against specified perils whilst the construction works might be insured against all risks.
Insurance will generally be in the form of a ‘joint names policy’ in the names of the contractor and the client. This gives both parties their own rights to claim against the insurer. Other parties, such as funders may also be added as a joint name.
Joint-names insurance will generally prevent claims against the co-insured party for an insured loss. Whether or not claims can be made by one party against the other for uninsured losses where one of the parties is at fault will depend on whether the contract permits this or not.
NB See also relevant events.
[edit] Related articles on Designing Buildings
Featured articles and news
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding.
Types of rapidly renewable content
From forestry to agricultural crops and their by-products.
Terraced houses and the public realm
The discernible difference between the public realm of detached housing and of terraced housing.
Put digitalisation and sustainability at the core of curricula
Project management educators are urged.
Looking back at the influence of climate events
From a designer and writer: 'There are limits to growth but no limits to development'.
Terms, histories, theories and practice.
Biophilic design and natural light
Letting in the light and natural elements into spaces.
APM Programme Management Conference 2024
Strategies for Success.
Residential takes the reins as contract awards even out
Contracts down, but remain above the last quarter of 2023.
Celebrating Eid and the largest mud-brick building.
Barry Kingscote claims prestigious CIOB CMYA Award.
The British Mosque: an architectural and social history
The story of some 1,500 mosques or more in Britain.
Heat pump refrigerants, efficiencies and impacts
R12 to R1270 what are the differences?
Global heat pump market in 2023
Challenging times with positive but modest outlook.
Beyond the infrastructure pipeline
Opportunities and chokepoints.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.